Know the kit.
Practice the response.
Owner and team quick-start, tabletop exercise and verification record. Follow installed-equipment manuals and the site handover; these materials do not authorize electrical work.
1. Essential-load walkthrough
Goal: identify what stays on and what must be disconnected.
- Locate the secured rack, battery controls and approved device list.
- Read the current battery state and alert thresholds from the site handover.
- Name the devices and peak loads approved for backup; avoid adding unassessed appliances.
- Confirm who owns the kit and who can access controls.
Pass: participant can explain the load priorities, reserve indicator and support route.
2. Outage tabletop and supervised drill
- Announce a simulated utility and internet outage; do not disable real systems without the approved test procedure.
- Check the expected battery path, recording continuity and alternate communications.
- Record actual time, battery state, connected loads and unexpected failures.
- State the low-reserve actions and escalation owner.
Pass: essential functions meet the acceptance criteria recorded for this site. Unknown runtime is a gap, not a passed check.
3. Alert and response role-play
Scenario: a configured perimeter event appears after hours.
- Review the relevant camera zone and distinguish an unverified detection from a confirmed event.
- Have the assigned person acknowledge; transfer ownership only after the next person accepts.
- Test an approved talk-down message at an agreed time and volume.
- Follow the incident escalation plan; preserve the event reference and outcome.
Pass: one current owner, acknowledgment and a documented outcome. No police-response guarantee.
4. Restore and maintain
- Follow the installed system's approved restoration procedure.
- Confirm power source, recording, network connection and battery recharge.
- Check solar obstructions, equipment health and maintenance dates.
- Where water is included, verify reserve, routing and intended use against the water plan; drinking-water suitability requires its own verification.
5. Instructor record and sign-off
Client/project: __________________ Site: __________________
Kit/version: __________________ Readiness level: __________________
Date/time/timezone: __________________ Instructor: __________________
Participants and designated backup: __________________
Evidence/test IDs: __________________ Measured reserve: __________________
Result: □ Passed defined checks □ Gaps remain □ Retest required
Assigned actions, owner and due date: __________________
Owner review and next drill: __________________
Training completion is not product certification, a validated 60–90-day endurance rating or clinical emergency-power qualification. Review this Draft against the exact installed kit before delivery.