1. Essential-load walkthrough

Goal: identify what stays on and what must be disconnected.

  1. Locate the secured rack, battery controls and approved device list.
  2. Read the current battery state and alert thresholds from the site handover.
  3. Name the devices and peak loads approved for backup; avoid adding unassessed appliances.
  4. Confirm who owns the kit and who can access controls.

Pass: participant can explain the load priorities, reserve indicator and support route.

2. Outage tabletop and supervised drill

  1. Announce a simulated utility and internet outage; do not disable real systems without the approved test procedure.
  2. Check the expected battery path, recording continuity and alternate communications.
  3. Record actual time, battery state, connected loads and unexpected failures.
  4. State the low-reserve actions and escalation owner.

Pass: essential functions meet the acceptance criteria recorded for this site. Unknown runtime is a gap, not a passed check.

3. Alert and response role-play

Scenario: a configured perimeter event appears after hours.

  1. Review the relevant camera zone and distinguish an unverified detection from a confirmed event.
  2. Have the assigned person acknowledge; transfer ownership only after the next person accepts.
  3. Test an approved talk-down message at an agreed time and volume.
  4. Follow the incident escalation plan; preserve the event reference and outcome.

Pass: one current owner, acknowledgment and a documented outcome. No police-response guarantee.

4. Restore and maintain

  1. Follow the installed system's approved restoration procedure.
  2. Confirm power source, recording, network connection and battery recharge.
  3. Check solar obstructions, equipment health and maintenance dates.
  4. Where water is included, verify reserve, routing and intended use against the water plan; drinking-water suitability requires its own verification.

5. Instructor record and sign-off

Client/project: __________________ Site: __________________

Kit/version: __________________ Readiness level: __________________

Date/time/timezone: __________________ Instructor: __________________

Participants and designated backup: __________________

Evidence/test IDs: __________________ Measured reserve: __________________

Result: □ Passed defined checks □ Gaps remain □ Retest required

Assigned actions, owner and due date: __________________

Owner review and next drill: __________________

Training completion is not product certification, a validated 60–90-day endurance rating or clinical emergency-power qualification. Review this Draft against the exact installed kit before delivery.